Sign in | Join us  
      
 Popular Searches:diamond,cbn,tuck point blade,cup wheel,saw blade, brown fused alumina
Home -- Information


  Featured Companies
 • Yantai Cct Metal…
 • Dymend Tools Co.,…
 • Henan Boreas New…
 • Yancheng Xiehe Machinery…
 • EKF Industrial Supplies…
 • Ruishi New Material…
 • MORESUPERHARD
 • Henan Banner New…
 • Zhengzhou best synthetic…
 • Zhengzhou Haixu…

 Print  Add to Favorite
Custom your font size:     

SAIL ISP commissions BOF and BF to start next month


Post Date: 19 Sep 2014    Viewed: 319

ET reported that Steel Authority of India Limited’s Burnpur based ISSCO Steel Plant has begun the countdown to start production from its new INR 17,000 crore integrated steel plant next month.

As part of the process, the new plant's First Basic Oxygen Furnac e(BOF) was lit up on September 14.

The commencement of BOF paves the way for starting up production from the new 4060 m3 Blast Furnace, next month.

With the operationalization of the new BF, integrated operations would start in the state of the art 2.5 million tonnes per annum steel plant

Under the expansion program of ISP, many major facilities like, a 7-metre tall Coke Oven Battery, 2x204 square metre Sinter Plant, Power and Blowing Station and 0.5 mtpa Wire Rod Mill have already commenced operations on standalone basis.

 


Superhard Material of China

Superhard Material of China

Abrasives and Grinding Products of China

Abrasives and Grinding Products of China

Coated Abrasives of China

Coated Abrasives of China

Chia International Abrasives & Grinding Exposition

China International Abrasives & Grinding Exposition

Home | About Us | Members | Contact | Advertising Quotation
Supported by Yuanfa Information Technology co.,Ltd
Copyright ©Abrasivesunion 2006. All rights reserved
Page rendered in 0.0203 seconds
增值电信业务经营许可证:豫B2-20202116  ICP备案:豫B2-20100036-2