Sign in | Join us  
      
 Popular Searches:diamond,cbn,tuck point blade,cup wheel,saw blade, brown fused alumina
Home -- Information


  Featured Companies
 • Yantai Cct Metal…
 • Dymend Tools Co.,…
 • Henan Boreas New…
 • Yancheng Xiehe Machinery…
 • EKF Industrial Supplies…
 • Ruishi New Material…
 • MORESUPERHARD
 • Henan Banner New…
 • Zhengzhou best synthetic…
 • Zhengzhou Haixu…

 Print  Add to Favorite
Custom your font size:     

Service Centers Shipments Falling, Inventories Rising


Post Date: 25 Sep 2014    Viewed: 311

 While August frequently delivers weak results in manufacturing, North America’s metal service centers reported deliveries for steel and aluminum slowing and inventories rising during the past month, indicating a continuing lack of momentum for regional industrial activity. The Metals Service Center Institute reported its U.S. and Canadian members’ shipments were “stagnant” during August, and though the year-over-year comparisons were mostly to the positive, the only real highlights of the monthly report may be seen in the year-to-date delivery volumes.

The figures are contained in MSCI’s monthly Metals Activity Report, a compilation of shipment and inventory data for service centers in the U.S. and Canada.

U.S. service centers shipped 3.6 million tons of steel products during August, 1.8% less than during July and only slightly more (+0.03) than during August 2013. With 29.3 million tons of steel shipped in total for the eight months of 2014, the U.S. center’s are 4.0% ahead of their 2013 volume.

As for inventories, the U.S. centers reported 9.0 million tons of steel products in stock, 3.1% more than during July and 13.5% more than during August 2013. At the current delivery rate, MSCI estimated this to represent a 2.5-month supply of steel in inventory.

In Canada, service centers’ steel deliveries totaled 456,600 tons during August, or 5.3% less than during July and 4.6% less than during August 2013. The year-to-date steel shipments from Canadian centers stand at 3.9 million tons, or 0.5% less than for the January-August 2013 period.

Steel inventories at Canada’s service centers totaled 1.49 million tons as August ended, rising 2.15% over the July total and 8.0% over the August 2013 total. At their current rate of deliveries, MSCI estimated Canadian service centers have 3.3 months worth of steel in stock.

Aluminum shipments from U.S. service centers declined 5.3% from July to August, totaling 135,200 tons, which is 1.6% more than the August 2013 result. The current year’s total aluminum deliveries have risen to 1.08 million tons, which is 8.2% more than the eight-month volume for 2013.

Inventories of aluminum products at U.S. service centers reportedly rose 3.8% from July to August, to 404,200 tons, which is 10.8 more than the operations had in stock during August 2013. At their current delivery rate, the U.S. service centers have 3.0 months of aluminum material in stock.

Canadian service centers shipped 12,900 tons of aluminum during August, 6.5% less than during July, and 2.0% more than during August 2013. Their year-to-date total for aluminum shipments is 107,500 tons, 2.4% more than during the first eight months of last year.

Aluminum inventories at Canada’s centers are now reported to be 41,200 tons, rising 6.7% from July and 15.0% from August 2013 levels.

At their current rate of deliveries, MSCI estimated that Canadian service centers have a 3.2-month supply of aluminum products.


Superhard Material of China

Superhard Material of China

Abrasives and Grinding Products of China

Abrasives and Grinding Products of China

Coated Abrasives of China

Coated Abrasives of China

Chia International Abrasives & Grinding Exposition

China International Abrasives & Grinding Exposition

Home | About Us | Members | Contact | Advertising Quotation
Supported by Yuanfa Information Technology co.,Ltd
Copyright ©Abrasivesunion 2006. All rights reserved
Page rendered in 0.0205 seconds
增值电信业务经营许可证:豫B2-20202116  ICP备案:豫B2-20100036-2