Sign in | Join us  
      
 Popular Searches:diamond,cbn,tuck point blade,cup wheel,saw blade, brown fused alumina
Home -- Information


  Featured Companies
 • Yantai Cct Metal…
 • Dymend Tools Co.,…
 • Henan Boreas New…
 • Yancheng Xiehe Machinery…
 • EKF Industrial Supplies…
 • Ruishi New Material…
 • MORESUPERHARD
 • Henan Banner New…
 • Zhengzhou best synthetic…
 • Zhengzhou Haixu…

 Print  Add to Favorite
Custom your font size:     

Tomb of the Unknowns: Repair, Maybe Replace?


Post Date: 07 Nov 2009    Viewed: 569

MARBLE, Colo. – After four years of waiting in a Colorado mountain town, the designated replacement stone for Arlington National Cemetery’s Tomb of the Unknowns may finally hit the road soon.


The massive block of Colorado Yule Marble should be transported to either Georgia or South Dakota for further inspection, according to the Denver Post. Whether it actually serves as the new monument at the country’s most-famous cemetery, however, as the replacement concept is still being hashed out among Washington politicians and lobbyists.


At this point, the block will be held in reserve; the U.S. Army Corps of Engineers will award a $70,000 contract to fix the monument’s problems.


The current monument, cut from the Yule Quarry in Marble in 1931, developed cracks shortly after its installation in the Virginia cemetery. Previous repair attempts failed to stop the spread of the cracks, which now are visible on all four sides of the monument.


The idea of replacing the monument came from Rex Loesby, former manager of the Yule Quarry, after visiting the cemetery 19 years ago. Cemetery officials warmed to the concept in 2002, and quarriers spent the next three years attempting to cut a suitable 190-ton-plus block. John Haines, a local car dealer and philanthropist in nearby Glenwood Springs, Colo., agreed to pay the $31,000 quarrying cost and the shipping to a carver to replicate the monument.


However, the replacement plan met with opposition from Robert Nieweg, director of the southern field office for the National Trust for Historic Preservation (NTHP). As the U.S. Army continued its public-review process for authorizing the replacement in mid-2007, Nieweg initiated an Internet-based campaign against the idea; the NTHP also placed the Tomb of the Unknowns on its “11 Most Endangered Historic Places” for 2007. (The record of that listing disappeared from the group’s online searchable archives last week, although the description is still available here.)


An amendment by Sens. Daniel Akaka (D-Hawaii) and Jim Webb (D-Va.) to a defense-appropriations bill in late 2007 required another study – the third since 1963 – be done on the monument’s condition. That report, released last August, noted the repair option, as well as replacement.


"If it can no longer be repaired, wonderful. We'll be ready for whatever," said Nieweg in a Post interview.


The study also noted the final cost replacement was estimated to cost $2.2 million, although that included a $50,000 purchase of the marble and $40,000 transport bill. Haines previously agreed to cover the purchase and transport as a donation.


Superhard Material of China

Superhard Material of China

Abrasives and Grinding Products of China

Abrasives and Grinding Products of China

Coated Abrasives of China

Coated Abrasives of China

Chia International Abrasives & Grinding Exposition

China International Abrasives & Grinding Exposition

Home | About Us | Members | Contact | Advertising Quotation
Supported by Yuanfa Information Technology co.,Ltd
Copyright ©Abrasivesunion 2006. All rights reserved
Page rendered in 0.0201 seconds
增值电信业务经营许可证:豫B2-20202116  ICP备案:豫B2-20100036-2